Reports for 2011

Archive of Reports

 
  Information report on the works implemented within the institutional aspects block in May-June 2011    
  download (pdf, 84 kB)    
     
  Information Report on Position A2.2.2 Introduction of daily and time-based water distribution in 10’000 hectares of WUAs    
  download (pdf, 10 kB)    
     
  Information Report  on the works implemented within the Institutional Aspects Block  for the period February-April 2011    
  download (pdf, 53 kB)