Reports for 2011 |
Archive of Reports |
||
Information report on the works implemented within the institutional aspects block in May-June 2011 | |||
download (pdf, 84 kB) | |||
Information Report on Position A2.2.2 Introduction of daily and time-based water distribution in 10’000 hectares of WUAs | |||
download (pdf, 10 kB) | |||
Information Report on the works implemented within the Institutional Aspects Block for the period February-April 2011 | |||
download (pdf, 53 kB) | |||